{"id":21141,"date":"2025-02-07T12:59:31","date_gmt":"2025-02-07T18:59:31","guid":{"rendered":"https:\/\/ewn.erdc.dren.mil\/?post_type=built-projects&#038;p=21141"},"modified":"2025-03-06T11:03:43","modified_gmt":"2025-03-06T17:03:43","slug":"big-river-at-calico-creek","status":"publish","type":"built-projects","link":"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/","title":{"rendered":"Big River at Calico Creek"},"content":{"rendered":"\n<p><strong>This project is featured in&nbsp;<a href=\"https:\/\/ewn.erdc.dren.mil\/atlas-series\/volume\/engineering-with-nature-an-atlas-volume-3\/\">Engineering With Nature: An Atlas, Volume&nbsp;<\/a><a href=\"https:\/\/ewn.erdc.dren.mil\/atlas-series\/volume\/engineering-with-nature-an-atlas-volume-3\/\" target=\"_blank\" rel=\"noreferrer noopener\">3<\/a>.<\/strong><\/p>\n\n\n\n<p>Location: Fletcher, Missouri, United States<\/p>\n\n\n\n<p><strong>Restoring a river to its historical natural form and function.<\/strong>&nbsp;Until the early 1970s, the Southeast Missouri Lead District was the world leader in lead production for nearly 100 years. Mining operations introduced gravel, sand, and silt-sized mine waste material into the Big River. During elevated flows, this material is transported downstream, depositing into both the channel and floodplain. Most impacted areas of the watershed are now designated as a U.S. Environmental Protection Agency (USEPA) Superfund site. In coordination with state partners, the U.S. Army Corps of Engineers (USACE)\u2013St. Louis District entered into an agreement with USEPA to design and construct a series of bank stabilization features in the Big River watershed near the confluence of the Calico Creek tributary. Historical imagery and topographic maps suggest that heavy equipment severely altered Calico Creek, creating an undesirable configuration near its confluence with the Big River. This project reconfigured the creek channel to its assumed previous layout and dimension, restoring it to a more natural form and function more conducive to balanced sediment transport through the reach.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"1002\" src=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000.jpg\" alt=\"A curved, rocky riverbank with water, green grass, and a line of green trees in the background on a blue sky with white clouds.\" class=\"wp-image-21147\" srcset=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000.jpg 1000w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000-300x300.jpg 300w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000-150x150.jpg 150w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000-768x770.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><figcaption class=\"wp-element-caption\">Bank 1 post construction, facing downstream, sloped and vegetated. A constructed containment area allows excess sediment to deposit and be retained. (Photo by USACE St. Louis District)<\/figcaption><\/figure>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\">\n<h4 class=\"wp-block-heading\">Producing Efficiencies<\/h4>\n\n\n\n<p>Sediment excavated from Calico Creek\u2019s new channel was reused as a \u201cplug\u201d for the old channel, greatly reducing haul distances and the need for bringing in new material. Similarly, in the construction of the three bank stabilization features within the Big River, excavated in-channel material was reused landward of the new layout to fill the old channel (as opposed to being hauled off site with new fill material needing to be delivered). Nearby cleared trees were also selectively used as root-wad revetment. Finally, scour calculations and velocity modeling optimized the rock placement rate for bank toe protection with an approach that balanced cost with the desired level of security.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-pre-construction_cr_USACE-StLouisDistrict.jpg\"><img decoding=\"async\" width=\"1024\" height=\"987\" src=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-pre-construction_cr_USACE-StLouisDistrict-1024x987.jpg\" alt=\"An eroded riverbank showing exposed brown dirt, with a large fallen tree branch in the water and barren trees in the background on a gray day.\" class=\"wp-image-21142\" srcset=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-pre-construction_cr_USACE-StLouisDistrict-1024x987.jpg 1024w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-pre-construction_cr_USACE-StLouisDistrict-300x289.jpg 300w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-pre-construction_cr_USACE-StLouisDistrict-768x740.jpg 768w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-pre-construction_cr_USACE-StLouisDistrict-1536x1480.jpg 1536w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-pre-construction_cr_USACE-StLouisDistrict.jpg 1771w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Bank 1 preconstruction, facing downstream. Vertical bank erosion progresses steadily through the lead-contaminated floodplain. (Photo by USACE St. Louis District)<\/figcaption><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-pre-construction_cr_USACE-StLouisDistrict.jpg\"><img decoding=\"async\" width=\"1024\" height=\"988\" src=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-pre-construction_cr_USACE-StLouisDistrict-1024x988.jpg\" alt=\"A flowing river with a grassy green bank on one side and a dry brown one on the other.\" class=\"wp-image-21145\" srcset=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-pre-construction_cr_USACE-StLouisDistrict-1024x988.jpg 1024w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-pre-construction_cr_USACE-StLouisDistrict-300x289.jpg 300w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-pre-construction_cr_USACE-StLouisDistrict-768x741.jpg 768w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-pre-construction_cr_USACE-StLouisDistrict.jpg 1297w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Bank 3 preconstruction, facing upstream. Vertical bank erosion progresses steadily toward a narrowing access road to the floodplain bottoms. (Photo by USACE St. Louis District)<\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\">\n<h4 class=\"wp-block-heading\">Using Natural Processes<\/h4>\n\n\n\n<p>Bank stabilization features were constructed using rootwad revetment, weirs, and longitudinal peaked stone toe protection (LPSTP) offset from the eroded bank. Root-wad revetment provides energy dissipation at the bank\u2019s toe while creating extensive in-stream cover for aquatic species. Weirs throughout the site provide additional stabilization while creating hydraulic and bathymetric variance in the channel. LPSTP provides a fixed channel border while recruiting sediment deposition between itself and the eroded bankline. Native vegetation was planted throughout the site. Species were selected to provide rooting to hold soil in place long-term while withstanding flooding at the elevation at which they were planted.<\/p>\n<\/div>\n<\/div>\n\n\n\n<h4 class=\"wp-block-heading\">Broadening Benefits<\/h4>\n\n\n\n<p>At Bank 1, the large offset between the new channel and the old bankline provides a sink for lead-laden soil to deposit and lock in place outside of the channel, which improves the habitat for aquatic species highly sensitive to lead levels. At Bank 3, the use of root-wad revetment provides additional aquatic habitat, which is beneficial for the environment and for fishing. The new orientation of the river channel provides a clearer and easier path for recreational users, with fewer obstacles and snags than before this project.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"648\" src=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/CalicoCreek-realigned_cr_USACE-StLouisDistrict-1024x648.jpg\" alt=\"A nearly dry creek being reshaped using rocks and stones, with sparse green grass and expossed brown dirt.\" class=\"wp-image-21146\" srcset=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/CalicoCreek-realigned_cr_USACE-StLouisDistrict-1024x648.jpg 1024w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/CalicoCreek-realigned_cr_USACE-StLouisDistrict-300x190.jpg 300w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/CalicoCreek-realigned_cr_USACE-StLouisDistrict-768x486.jpg 768w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/CalicoCreek-realigned_cr_USACE-StLouisDistrict.jpg 1292w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Calico Creek realigned into a more natural configuration that is more conducive to balanced sediment transport through the reach. (Photo by USACE St. Louis District)<\/figcaption><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Promoting Collaboration<\/h4>\n\n\n\n<p>The USACE St. Louis District coordinated with USEPA, the U.S. Fish and Wildlife Service, and Missouri Department of Natural Resources to balance agency authorities, funding limitations, and project objectives. Ultimately, a project was constructed to address environmental concerns while providing value to three adjacent landowners who were losing their banklines.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank2-stabilized-using-weirs_cr_USACE-StLouisDistrict.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"645\" src=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank2-stabilized-using-weirs_cr_USACE-StLouisDistrict-1024x645.jpg\" alt=\"A calm river below a sloping bank with exposed brown dirt and bare trees in the background on a gray day.\" class=\"wp-image-21143\" srcset=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank2-stabilized-using-weirs_cr_USACE-StLouisDistrict-1024x645.jpg 1024w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank2-stabilized-using-weirs_cr_USACE-StLouisDistrict-300x189.jpg 300w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank2-stabilized-using-weirs_cr_USACE-StLouisDistrict-768x484.jpg 768w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank2-stabilized-using-weirs_cr_USACE-StLouisDistrict.jpg 1297w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Bank 2 stabilized using weirs, which push the energy from the river away from the bankline and toward the thalweg. (Photo by USACE St. Louis District)<\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-post-construction_cr_USACE-StLouisDistrict.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"648\" src=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-post-construction_cr_USACE-StLouisDistrict-1024x648.jpg\" alt=\"A newly restored riverbank showing brown dirt and planted vegetation that hasn't grown in yet.\" class=\"wp-image-21144\" srcset=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-post-construction_cr_USACE-StLouisDistrict-1024x648.jpg 1024w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-post-construction_cr_USACE-StLouisDistrict-300x190.jpg 300w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-post-construction_cr_USACE-StLouisDistrict-768x486.jpg 768w, https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank3-post-construction_cr_USACE-StLouisDistrict.jpg 1292w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Bank 3 postconstruction, facing upstream, sloped and vegetated. A constructed bench extends into the river and terminates with root-wad revetment. (Photo by USACE St. Louis District)<\/figcaption><\/figure>\n<\/div>\n<\/div>\n","protected":false},"featured_media":21147,"template":"","tags":[117,95],"project-categories":[],"class_list":["post-21141","built-projects","type-built-projects","status-publish","has-post-thumbnail","hentry","tag-pg-mississippivalley","tag-pg-stlouis"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Big River at Calico Creek - Engineering With Nature<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Big River at Calico Creek - Engineering With Nature\" \/>\n<meta property=\"og:description\" content=\"This project is featured in&nbsp;Engineering With Nature: An Atlas, Volume&nbsp;3. Location: Fletcher, Missouri, United States Restoring a river to its historical natural form and function.&nbsp;Until the early 1970s, the Southeast Missouri Lead District was the world leader in lead production for nearly 100 years. Mining operations introduced gravel, sand, and silt-sized mine waste material into [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineering With Nature\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-06T17:03:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1002\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/built-projects\\\/big-river-at-calico-creek\\\/\",\"url\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/built-projects\\\/big-river-at-calico-creek\\\/\",\"name\":\"Big River at Calico Creek - Engineering With Nature\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/built-projects\\\/big-river-at-calico-creek\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/built-projects\\\/big-river-at-calico-creek\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000.jpg\",\"datePublished\":\"2025-02-07T18:59:31+00:00\",\"dateModified\":\"2025-03-06T17:03:43+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/built-projects\\\/big-river-at-calico-creek\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ewn.erdc.dren.mil\\\/built-projects\\\/big-river-at-calico-creek\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/built-projects\\\/big-river-at-calico-creek\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000.jpg\",\"contentUrl\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000.jpg\",\"width\":1000,\"height\":1002,\"caption\":\"Bank 1 post construction, facing downstream, sloped and vegetated. A constructed containment area allows excess sediment to deposit and be retained. (Photo by USACE St. Louis District)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/built-projects\\\/big-river-at-calico-creek\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Big River at Calico Creek\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/#website\",\"url\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/\",\"name\":\"Engineering With Nature\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/#organization\",\"name\":\"Engineering With Nature\",\"url\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/wp-content\\\/uploads\\\/2021\\\/07\\\/alternate-header-log-from-elly.jpg\",\"contentUrl\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/wp-content\\\/uploads\\\/2021\\\/07\\\/alternate-header-log-from-elly.jpg\",\"width\":1200,\"height\":156,\"caption\":\"Engineering With Nature\"},\"image\":{\"@id\":\"https:\\\/\\\/ewn.erdc.dren.mil\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Big River at Calico Creek - Engineering With Nature","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/","og_locale":"en_US","og_type":"article","og_title":"Big River at Calico Creek - Engineering With Nature","og_description":"This project is featured in&nbsp;Engineering With Nature: An Atlas, Volume&nbsp;3. Location: Fletcher, Missouri, United States Restoring a river to its historical natural form and function.&nbsp;Until the early 1970s, the Southeast Missouri Lead District was the world leader in lead production for nearly 100 years. Mining operations introduced gravel, sand, and silt-sized mine waste material into [&hellip;]","og_url":"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/","og_site_name":"Engineering With Nature","article_modified_time":"2025-03-06T17:03:43+00:00","og_image":[{"width":1000,"height":1002,"url":"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/","url":"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/","name":"Big River at Calico Creek - Engineering With Nature","isPartOf":{"@id":"https:\/\/ewn.erdc.dren.mil\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/#primaryimage"},"image":{"@id":"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/#primaryimage"},"thumbnailUrl":"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000.jpg","datePublished":"2025-02-07T18:59:31+00:00","dateModified":"2025-03-06T17:03:43+00:00","breadcrumb":{"@id":"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/#primaryimage","url":"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000.jpg","contentUrl":"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2025\/02\/Bank1-post-construction_cr_USACE-StLouisDistrict-1000.jpg","width":1000,"height":1002,"caption":"Bank 1 post construction, facing downstream, sloped and vegetated. A constructed containment area allows excess sediment to deposit and be retained. (Photo by USACE St. Louis District)"},{"@type":"BreadcrumbList","@id":"https:\/\/ewn.erdc.dren.mil\/built-projects\/big-river-at-calico-creek\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ewn.erdc.dren.mil\/"},{"@type":"ListItem","position":2,"name":"Big River at Calico Creek"}]},{"@type":"WebSite","@id":"https:\/\/ewn.erdc.dren.mil\/#website","url":"https:\/\/ewn.erdc.dren.mil\/","name":"Engineering With Nature","description":"","publisher":{"@id":"https:\/\/ewn.erdc.dren.mil\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ewn.erdc.dren.mil\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ewn.erdc.dren.mil\/#organization","name":"Engineering With Nature","url":"https:\/\/ewn.erdc.dren.mil\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ewn.erdc.dren.mil\/#\/schema\/logo\/image\/","url":"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2021\/07\/alternate-header-log-from-elly.jpg","contentUrl":"https:\/\/ewn.erdc.dren.mil\/wp-content\/uploads\/2021\/07\/alternate-header-log-from-elly.jpg","width":1200,"height":156,"caption":"Engineering With Nature"},"image":{"@id":"https:\/\/ewn.erdc.dren.mil\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/ewn.erdc.dren.mil\/index.php\/wp-json\/wp\/v2\/built-projects\/21141","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ewn.erdc.dren.mil\/index.php\/wp-json\/wp\/v2\/built-projects"}],"about":[{"href":"https:\/\/ewn.erdc.dren.mil\/index.php\/wp-json\/wp\/v2\/types\/built-projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ewn.erdc.dren.mil\/index.php\/wp-json\/wp\/v2\/media\/21147"}],"wp:attachment":[{"href":"https:\/\/ewn.erdc.dren.mil\/index.php\/wp-json\/wp\/v2\/media?parent=21141"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ewn.erdc.dren.mil\/index.php\/wp-json\/wp\/v2\/tags?post=21141"},{"taxonomy":"project-categories","embeddable":true,"href":"https:\/\/ewn.erdc.dren.mil\/index.php\/wp-json\/wp\/v2\/project-categories?post=21141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}