April 1, 2022

A Novel Wave Attenuator: Wave Transmission Testing Results

Walter Marine and Atlantic Reefmaker entered into a testing service agreement with the US Army Engineer Research and Development Center (ERDC) to perform wave transmission experimental testing on a novel wave attenuator product. This testing was meant to evaluate the reduction in wave height provided by the Reefmaker Ecosystems Wave Attenuator structure using a physical model.

Read the full publication

A section of Ecosystem Wave Attenuator installed in Brunswick Town – Fort Anderson on Cape Fear River, NC.
Ecosystem Wave Attenuator installed near Bonner Bridge/Oregon Inlet.
An aerial view of Ecosystem Wave Attenuator at Brunswick Town – Fort Anderson with waves flushing.
Model (1:5.2) wave attenuator in the flume for testing at the ERDC Coastal Hydraulics Laboratory in Vicksburg, MS..

Facebook
Twitter
LinkedIn
Email

More Posts

From Dredged Material to Thriving Mangroves: Florida Study Releases Key Restoration Data

From Dredged Material to Thriving Mangroves: Florida Study Releases Key Restoration Data

A new collection of datasets produced for the “Beneficial Use of Dredge Material in Mangrove…
Engineering With Nature® Announces New Publication on Advancing Environmental Management Practices

Engineering With Nature® Announces New Publication on Advancing Environmental Management Practices

The Engineering With Nature® (EWN®) initiative is proud to share a new publication led by…
Great Lakes Coastal Resilience Study - Lake Superior Visit

Great Lakes Coastal Resilience Study - Lake Superior Visit

Purpose The Engineering With Nature® Playbook Project Development Team traveled to Lake Superior to view…